动力
动力系统拥有110kV变电站五座,10万、8万、3万立方米煤气柜各一座,6MW饱和蒸汽发电机组一台,25MW中温中压燃气发电机组一台、80MW高温超高压煤气发电机组两台,7.5MW烧结余热发电机组一台,分布式光伏发电站总装机容量达到18.2MW。污水处理站1座,年可处理污水850万m3,地表水站1座,与处理后的中水共同保障生产用水。
The company’s power system comprises five 110kV substations, one 100,000m3, 80,000m3 and 30,000m3 gas tank respectively, one 6MW saturated steam generator set, one 25MW medium-temperature and medium-pressure gas generator set, two 80MW high-temperature and ultra-high-pressure gas generator sets, and one 7.5MW sintering waste heat generator set. The total installed capacity of the distributed photovoltaic power station reaches 18.2MW. The company also operates a sewage treatment station with an annual capacity of 8.5 million m3 and surface water stations that ensure production water supply in conjunction with treated reclaimed water.
煤气发电厂 GAS POWER PLANT
煤气发电厂主控室 MASTER CONTROL ROOM OF GAS POWER PLANT
TRT 发电 TRT GENERATOR
10 万立方米高炉煤气柜 THE 100,000M3 BLAST FURNACE GAS TANK
8 万立方米转炉煤气柜 THE 80,000M3 CONVERTOR GAS TANK
5 万立方米转炉煤气柜 THE 50,000M3 CONVERTOR GAS TANK